Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9294226

- Product Categories
- Friendly Links
Information Name: | Universal Supply JS waterproof coating of cement-based polymer |
Published: | 2013-03-22 |
Validity: | 200 |
Specifications: | |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | JS cement-based polymer good resistance to water pressure, anti-aging properties. Have a good effect in a variety of complex base surface, brushing strong bonding with the substrate. For the positive side or back surface of the water, its water efficiency does not change. Good permeability, and to maintain the substrate dry. Moist basic plane the subsequent construction dryness. Scope: interior and exterior, kitchen, bathroom, balcony, reservoirs, warehouse, basement waterproofing and wood flooring, wallpaper Paving moisture treatment. Dosage: flat base surface 1.3-1.8kg/m2. Construction program based surface treatment: clean up the base surface should be smooth and firm, without hollowing. Pores, trachoma to be filled with cement mortar smooth and sharp edges should be removed. Such as high temperatures or the drier base surface, before the construction of the application of water to fully wet water to ignorance prevail. Construction process: first the liquid material into the mixing bucket, stirring slowly pour the powder with an electric mixer edge, and stir to evenly silt no precipitation cream paste, stirring the stand for a few minutes and then slightly may be used. If the slurry is too thick or drag brush, may be appropriate to add no more than 10% of the total amount of water, Stir. Brushing directly at the base surface has been handled well with a brush or roller, not leak brush, brushing If stomata repeatedly brushing gas discharge. Brushing finished the first pass should wait until the table dry (just sticky hands) the second time after brushing, brushing direction should be staggered with the former again, each brushing can not exceed the thickness of 0.8mm, so as not to affect the construction effects . Note: not below 0 ℃ or rain Construction stirred slurry should be used within 2 hours. The air is particularly humid, poorly ventilated places, ventilation equipment should be used to speed up the waterproof layer to dry. 24 hours after construction shall test the water and completely dry before do other overlay. Preservation methods: This product should be placed in a cool, well-ventilated place, unopened product can be stored for one year. Product packaging: 5kg / drum 34kg / barrel (10kg emulsion +24 kg (1.5kg emulsion +3.5 kg powder) 9kg / barrel (2.65kg emulsion +6.35 kg powder) 18kg / barrel (5.3kg emulsion +12.7 kg powder) powder) |
Admin>>>
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility