Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9294226

- Product Categories
- Friendly Links
- home > Supply > Supply roofing JS cement-based waterproof polymer coating with Guangzhou in Europe Nike
Information Name: | Supply roofing JS cement-based waterproof polymer coating with Guangzhou in Europe Nike |
Published: | 2013-04-08 |
Validity: | 1000000 |
Specifications: | |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | Good resistance to water pressure, anti-aging properties JS cement-based polymer. Strong bond with the substrate, brushing have good results in a variety of complex surface of the base. For the positive side or the back surface of the water, its waterproof efficiency does not change. Good permeability to keep the dry substrate. Available in the the moist basic plane to dryness to subsequent construction. Scope: interior and exterior, kitchen, bathroom, balcony, tanks, warehouses, basement waterproofing and wood flooring, wallpaper Stones before the moisture treatment. The Dosage: flat base surface 1.3-1.8kg/m2. Construction program base surface treatment: clean the base surface should be smooth and firm, without hollowing. Pores, trachoma is required with cement mortar to fill the flat, sharp edges should be removed. Such as high temperatures or drier base surface, before the construction of the application of water to fully wet to ignorance and water shall prevail. Construction process: first liquid material into the mixing bucket, stirring slowly pour the powder side with an electric mixer, stir until a uniform silt no precipitation paste, put it aside for a few minutes and then mixing that is a little may be used. If the slurry is too thick or trailers brush, can be appropriately added does not exceed 10% of the total amount of water, stir and then use. Direct brushing with a brush or roller in good base surface, not leak brush, brushing if holes should be repeated brushing the gas discharges. After brushing first pass should be treating its table (just sticky) after brushing the second time, the second brushing direction should be staggered to the front again, brushing a thickness of not more than 0.8 mm, so as not to affect the construction results . Note: You can not below 0 ℃ or rain construction, the stirred slurry should be used within 2 hours. The air is particularly humid, unventilated area ventilation equipment should be used to speed up the waterproof layer to dry. 24 hours after construction shall test the water and completely dry before do other overburden layers. Storage: The product should be placed in a cool, well-ventilated place, unopened product can be stored for one year. Packing: 5kg / drum the (1.5kg emulsion +3.5 kg powder) of 9kg / barrel (2.65kg emulsion +6.35 kg powder) 18kg / barrel (5.3kg emulsion +12.7 kg powder) 34kg / barrel (10kg emulsion +24 kg powder) |
Admin>>>
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility