Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9294226

- Product Categories
- Friendly Links
- home > Supply > Guangzhou Ou Nike top ten brands of waterproof paint supply RS-240 waterproof emulsion
Information Name: | Guangzhou Ou Nike top ten brands of waterproof paint supply RS-240 waterproof emulsion |
Published: | 2013-04-26 |
Validity: | 30 |
Specifications: | |
Quantity: | 1000000000.00 |
Price Description: | |
Detailed Product Description: | Pure acrylic-component foreign-funded enterprises the main raw materials and technology, product performance. Non-toxic, environmental protection, can be used for drinking water, pool waterproof material. The construction is simple, direct brushing. High elasticity of the coating, water and good weather resistance. Scope: roofing, interior and exterior, bathroom, pool water trap works. Use: 1, the base surface clean up the smooth, firm, clean, free from dust, no water. 2, porosity, trachoma is required with cement mortar to fill a smooth, sharp edges should be removed. 3, such as high temperatures or drier base surface, application of water to fully wet construction to ignorance and water shall prevail. 4, the construction should stir brushing time should not exceed 1 mm, should generally be brushing three to four times, the more complex parts of the structure can be used non-woven fabrics for the enhancement layer. 5, with a brush or roller brushing directly deal with a good base surface, not drain brush, brushing if pores should be repeated brushing the gas discharges, brushing finished the first pass should let it the table dry (just non-stick hand) after brushing the second time, the brushing direction should be staggered with the first pass. Old roof repair should have been broken, loose local old waterproof layer to clean, trapping surface is greater than one-third of the original rupture. 7, the use of non-woven fabrics for reinforcement layer, before brushing → → non-woven, after brushing construction no interval. Note: You can not below 0 ℃ or rain construction. Within 24 hours after construction shall not test the water, completely dry before do other overburden layers. Storage: Store in a cool dry place, unopened product can be stored for one year. Packing: 1kg / bottle 5kg / drum 20kg / barrel |
Admin>>>
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility