Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9294226

- Product Categories
- Friendly Links
- home > Supply > Guangzhou factory supply the basement car park waterproofing works preferred European Nike Outlet Low
Guangzhou factory supply the basement car park waterproofing works preferred European Nike Outlet Low
Information Name: | Guangzhou factory supply the basement car park waterproofing works preferred European Nike Outlet Low |
Published: | 2013-04-27 |
Validity: | 30000000 |
Specifications: | |
Quantity: | 100000000.00 |
Price Description: | |
Detailed Product Description: | Kitchen water is non-toxic, odorless, firmly bonded, quick-drying, high strength. High strength, micro-expansion, the performance of the bond strong, high impermeability is the leading domestic level. Easy to use, easy to operate, for the positive side or back surface of the water, can achieve the effect of water plugging. Scope: basement, bathroom, pool, tunnels, culverts, dam and roof water seepage plugging. The various pressures tube emergency repairs, emergency installation of machinery and equipment. How to use: grass-roots should be firm, no oil, and grass-roots surface is sufficiently wet. Ingredients: A resistance to water penetration Engineering (powder: water = 1:0.5), transferred into a uniform putty-like. B, with water plugging Engineering (powder: water = 1:0.25), appropriate modulation lumps. Water impermeability: Plastering construction method, the coating is generally for a 2-3, each process should be if they had to cross. With water plugging: plugging construction method, the leakage point hewn v-port or dovetail groove, the initial setting of the agglomerates, slightly harder when inserted into the water seepage, the surface should be compacted trowel severe leaks sprinkle dry powder compaction or drainage tube decompression, first plug the leak, after blocking the drain, finally blocking decompression hole. Moisture conservation: hardened moisture conservation: water, cover with a damp cloth. Note: Initial setting time: the temperature conditions of 25 ° C, rapid setting about 3 minutes, retarding about 60 minutes. When the temperature is below 15 ° C, to use more than 40 ° C warm water stirring. Open the package and run out of time, or sealed stored in a dry room. Storage: Unopened products placed in a cool dry place Shelf life is 12 months. Product packaging: 5kg / bag 25kg / bag |
Admin>>>
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility