Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9294226

- Product Categories
- Friendly Links
Information Name: | Roof, floor, water trap to K11 highly flexible coatings |
Published: | 2013-05-14 |
Validity: | 0 |
Specifications: | |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | Roof, balcony water trap with Guangzhou Au Nike K11 highly flexible, elastic waterproof material, excellent UV resistance, aging resistance, can be used for roofing and other exposed waterproof. 2, excellent flexibility, can withstand a slight vibration and micro-cracks in the building. Brushing a variety of complex surface of the base have good results in strong bonding with the substrate to form a seamless whole. 4, the stability of the elastic waterproof layer. 5, good air permeability, to maintain the substrate dry. 6, in the wet surface of the base construction, the slurry dries to subsequent construction. Scope: interior and exterior, roof, kitchen, bathroom, balcony, pool, bridge, basement waterproofing. The Dosage: flat base surface 1.3-2kg/m2. Construction program: clean the base surface should be smooth and firm, without hollowing. Pores, trachoma is required with cement mortar to fill the flat, sharp edges should be removed. Such as high temperatures or drier base surface, before the construction of the application of water to fully wet to ignorance and water shall prevail. Construction process: first liquid material into the mixing bucket, stirring slowly pour the powder side with an electric mixer, stir until evenly without powder, no precipitation paste, put it aside for a few minutes and then slightly stir use. If the slurry is too thick or drag brush, may be appropriate to add no more than 5% of the total amount of water, stir. Directly with a brush or roller to paint the processed base surface, can not be missed brush, brushing if holes should be repeated brushing the gas discharges. After brushing first pass should be treating its table (just sticky) after brushing the second time, the second brushing direction should be staggered to the front again, brushing a thickness of not more than 0.8 mm, so as not to affect the construction effect . Note: can not be below 0 ℃ or rain construction, the stirred slurry should be used within 2 hours. The air is particularly humid, unventilated area ventilation equipment should be used to speed up the waterproof layer to dry. 24 hours after construction shall not test the water and completely dry before do other overburden layers. Storage: The product should be placed in a cool, well-ventilated place, unopened product can be stored for one year. Packing: 5kg / drum the (2kg emulsion +3 kg powder) of 9kg / barrel (3.6kg emulsion +5.4 kg powder) 18kg / barrel (7.3kg emulsion +10.7) 42 kg / kg powder (17kg the emulsion +25 kg powder ) |
Admin>>>
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15753 visitor
Copyright © GuangDong ICP No. 10089450, Europe Nike Building Material Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility